Solar Switch

Engineering · Procurement · Construction

Engineered solar, residential to industrial

SolarSwitch designs and delivers solar systems from residential rooftops to industrial installations — managing the full project lifecycle from feasibility to long-term operations. Every system is handed over with complete technical documentation and 5 years of after-sales maintenance.

System capacity delivered

One scale, three engineering problems

Homes Residential · 3–15 kWp

Homes

Grid-tied, hybrid and off-grid systems sized against twelve months of actual consumption and daylight usage — not a package tier.

Business facilities Commercial · 15–250 kWp

Business facilities

Above 5 kW of demand, Meralco bills on peak kilowatts as well as kilowatt-hours. The design question becomes not just how much you use, but when.

Plants & logistics Industrial · 250 kWp +

Plants & logistics

Rooftop, ground-mount and carport installations delivered as full EPC scope, with structural engineering and formal commissioning.

System range
3–500 kWp+
Service model
EPC & O&M
Configurations
Grid-tied · Hybrid · Off-grid
Maintenance
5 years
Documentation
Full handover
Design standard
Philippine Electrical Code

Delivery scope

What full-scope delivery covers

Six stages, each closing with a document you keep. The sequence is the same whether the system is 5 kWp or 500 — only the depth of each stage changes.

01

Feasibility & technical assessment

Consumption analysis from twelve months of billing data. Site inspection covering roof structure, available area, orientation, shading and electrical infrastructure. Production modelling against your actual load profile, then capital cost, projected offset, payback and sensitivity.

Deliverable

Feasibility report with stated assumptions

02

Engineering & design

System architecture, single-line diagrams, array layout, structural mounting design, cable sizing, protection coordination and earthing design. All electrical plans prepared and signed by a PRC-licensed Professional Electrical Engineer.

Deliverable

Signed drawing set & technical specification

03

Permitting & regulatory

LGU electrical permit application and Certificate of Final Electrical Inspection. Distribution utility interconnection application. Net metering application and coordination through to approval. Certificate of Compliance issued on completion.

Deliverable

Complete permit & approval file

04

Procurement

Equipment specified by full model number in the contract, not by brand alone. Sourced from manufacturers with established Philippine distribution and verifiable warranty support. Substitution after signature requires written client approval.

Deliverable

Equipment schedule with serials recorded at delivery

05

Construction & commissioning

Mechanical installation, weatherproofing of every roof penetration, electrical installation, protection devices, earthing and connection. Testing and commissioning against design specification, with witnessed demonstration.

Deliverable

Commissioning test results & acceptance certificate

06

Operations & maintenance

Scheduled inspections, cleaning, inverter health checks, performance review against the original production model, and manufacturer warranty claims handled on your behalf. Five years included on every installation, extendable under formal agreement.

Deliverable

Maintenance schedule & performance reports

Technical capability

Systems we design & build

Configuration follows the load profile and the site, not a catalogue. The right answer for a warehouse peaking at 6 p.m. is different from one for a cold store running around the clock.

Grid-tied

Maximum return where supply is reliable and consumption is daytime-weighted

Hybrid with storage

Bill reduction plus backup; peak shaving where demand charges dominate

Off-grid

Sites with no grid connection, or where supply is unreliable

Battery energy storage

Standalone or retrofit, sized to critical loads or to peak-shaving economics

Ground-mount & carport

Where roof area is insufficient or land is available

Mounting systems

Standing seam metal · trapezoidal GI sheet · concrete deck · tile · ballasted · ground-mount foundations

Compliance

Registration & standards

Registration numbers are published so they can be verified independently. A badge proves nothing; a number can be checked.

DTI business name registration

No. 4990868 — national scope, valid to 01 June 2028

Local business permit

Current — Business ID No. 2023-10-61012

Tax registration

BIR registered

Electrical design & certification

All plans and Certificates of Compliance signed by a PRC-licensed Professional Electrical Engineer

Installation standard

Philippine Electrical Code and distribution utility requirements

Insurance

Contractor’s all-risk and public liability

Handover standard

Every project closes with a complete file

Documentation is what lets any qualified contractor service the system, and what lets you claim directly against a manufacturer warranty years from now. Issued as standard on every project, residential and industrial alike.

  • As-built single-line diagram and array layout drawings
  • Certificate of Compliance, signed by a PRC-licensed engineer
  • LGU electrical permit and Certificate of Final Electrical Inspection
  • Distribution utility net metering approval and executed agreement
  • Complete equipment serial number schedule
  • Manufacturer warranty certificates and technical datasheets
  • Monitoring platform access, registered in your name
  • Commissioning test results
  • Operations and maintenance manual with service schedule
  • Performance model with the assumptions used

Warranty structure

Three warranties, not one

Most quotes advertise "25-year warranty" without saying which one. There are several, they cover different things, and they run for different lengths of time. Exact terms for your specified equipment are issued in writing with every proposal.

Product

Manufacturing defects in modules

Term

Manufacturer's Warranty

Performance

Guaranteed output over time

Term

10–12 years.

Inverter

Unit and firmware

Term

Manufacturer's Warranty

Workmanship

Mounting, weatherproofing, cabling, terminations, earthing — including roof penetrations

Term

Contract

Maintenance

Scheduled service and performance review

Term

5 years

Enquiries

Discuss a project

Residential

Send us your Meralco bill

Twelve months if you have them, one if that's all you can find. Tell us roughly when the household uses power, and whether staying on during a brownout matters. We'll model what a system would actually offset — including if the honest answer is that a smaller one suits you better.

Request a home assessment

Commercial & industrial

Start with a feasibility review

For projects above 15 kWp we begin with a technical and commercial feasibility review. Send twelve months of billing data including demand (kW) figures, and your load profile data from the distribution utility if you can obtain it — it is the single most useful input to a commercial design.

Request a project consultation
Message us